EP1078190B1 - Heavy weight drill pipe - Google Patents

Heavy weight drill pipe Download PDF

Info

Publication number
EP1078190B1
EP1078190B1 EP99920274A EP99920274A EP1078190B1 EP 1078190 B1 EP1078190 B1 EP 1078190B1 EP 99920274 A EP99920274 A EP 99920274A EP 99920274 A EP99920274 A EP 99920274A EP 1078190 B1 EP1078190 B1 EP 1078190B1
Authority
EP
European Patent Office
Prior art keywords
drill pipe
tubular
heavy weight
weight drill
tool joint
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
EP99920274A
Other languages
German (de)
French (fr)
Other versions
EP1078190A1 (en
EP1078190A4 (en
Inventor
Gerald E. Wilson
R. Thomas Moore
Wei Tang
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Grant Prideco LP
Original Assignee
Grant Prideco LP
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority to US09/071,253 priority Critical patent/US6012744A/en
Priority to US71253 priority
Application filed by Grant Prideco LP filed Critical Grant Prideco LP
Priority to PCT/US1999/009621 priority patent/WO1999057478A1/en
Publication of EP1078190A1 publication Critical patent/EP1078190A1/en
Publication of EP1078190A4 publication Critical patent/EP1078190A4/en
Application granted granted Critical
Publication of EP1078190B1 publication Critical patent/EP1078190B1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B17/00Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
    • E21B17/16Drill collars
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B17/00Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
    • E21B17/22Rods or pipes with helical structure
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y10TECHNICAL SUBJECTS COVERED BY FORMER USPC
    • Y10TTECHNICAL SUBJECTS COVERED BY FORMER US CLASSIFICATION
    • Y10T29/00Metal working
    • Y10T29/49Method of mechanical manufacture
    • Y10T29/49826Assembling or joining
    • Y10T29/49904Assembling a subassembly, then assembling with a second subassembly
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y10TECHNICAL SUBJECTS COVERED BY FORMER USPC
    • Y10TTECHNICAL SUBJECTS COVERED BY FORMER US CLASSIFICATION
    • Y10T403/00Joints and connections
    • Y10T403/68Screw or cam

Description

    Field of the Invention
  • The present invention primarily relates to specially treated heavy weight drill pipe used for drilling high angle or horizontal well bores in a corrosive environment. In particular, this invention relates to heat treated drill pipe having a weight per foot that is intermediate the weight per foot of the drill collars and the drill pipe, one or both of which combine with the intermediate weight pipe to make up a drill string.
  • Background of the Invention
  • Drill collars are very stiff within a wall thickness of approximately 5.1 cm (2") in order that most of the bending takes place in the connections. Consequently, fatigue cracks develop in the drill collar connections. Drill pipe has a thin wall tube and a wall thickness of approximately 0.95 cm (3/8") so that most of all of the flexing takes place in the tube and not in the connections. Thus, fatigue cracks develop in the tube near the fade out of the upset or protectors. Intermediate weight drill string members are usually referred to as "heavy weight" drill pipe to distinguish between the regular drill pipe and drill collars, and have an approximate 2.54 cm (1") wall thickness resulting in a stiffness somewhere between that of drill collars and drill pipe creating characteristics common to both drill pipe and drill collars in that some of the bending takes place in the connections resulting in some fatigue cracks, but not to the degree found in drill collar connections.
  • In the past, standard heavy weight (thick wall) drill pipe has worked well in vertical or near vertical well bores in non-corrosive environments, but has been less than successful in horizontal wells drilled in corrosive environments.
  • Heavy weight drill pipe is used as transition pipe between the heavy drill collars and the relatively light weight drill pipe to prevent shock loads and bending stress from reaching the drill pipe. When heavyweight drill pipe is not used, the drill pipe near the top of the drill collars can suffer severe fatigue damage and failure.
  • In horizontal drilling, heavy weight drill pipe is run in compression to put weight on the drill bit. When the hole was kicked off more or less gradually, the heavy weight drill pipe was subjected to relatively small bending stresses. Now, however, with the hole being kicked off at 15 to 25 degrees per 30.5 m (100 feet) instead of 3 degrees per 30.5 m (100 feet), substantial bending stress is imposed on the heavy weight drill pipe.
  • The pipe, when in compression is also being forced against the side of the hole and subjected to differential pressure sticking.
  • Additionally, stress corrosion cracking failures in heavy weight drill pipe are increasing due to more corrosive drilling fluids, including the increased use of low-ph, low-solids brine and polymer muds, and the increased presence of hydrogen sulfide and carbon dioxide.
  • Standard heavy weight drill pipe tubes are made from normalized AISI 134.0 carbon steel that has a mixed micro structure with large grains, resulting in a 379,211 kPa (55,000 psi) minimum tensile yield strength and a low impact strength of approximately 20 J (15 ft.-lbs). This is a soft material that is good in hydrogen sulfide, but the micro structure is not very resistant to fatigue because of the large grain size and low impact strength. Consequently, this micro structure is less resistant to stress corrosion cracking and hydrogen embrittlement.
  • Standard heavy weight drill pipe tool joints are made from drill collar material which is standard AISI 4145 modified but is then liquid quenched and heat tempered to a high Brinell hardness between 302 and 341. The minimum tensile yield strength on standard heavy weight drill pipe tool joints will run approximately 758,423 kPa (110,000 psi) and its impact strength is approximately 68 J (50 ft.-lbs) Although the high hardness of heavy weight drill pipe tool joints is not preferred for hydrogen sulfide service, the tool joints are not as critical as the tubing because the stresses are low in the tool joints when compared to the tubes. However, increased bending stresses in the tube are directly related to the stiffness encountered in standard heavy weight drill pipe tool joints.
  • Although conventional heavy weight drill pipe addresses reducing fatigue, stress and wear on drill string members used in conventional or deviated well bores by incorporating certain structural features, these features are inadequate for use in high angle and horizontal holes in a corrosive environment. For example, prior art such as U. S. Patent Nos. 3,773,359 to Chance et al. and 4,811,800 to Hill et al. utilize standard heavy weight drill pipe with upsets or protectors, spiraling in the surface of the upsets and/or hard banding the exterior surface of the protectors which collectively are inadequate for use in a high angle or horizontal well bores that have a corrosive environment.
  • Likewise US 4,226,645 Al discloses a.steel well casing having an excellent resistance to hydrogen sulfide stress corrosion and a yield strength ranging upward from 620,528 kPa to 999,740 kPa (90,000 to 145,000 psi) comprised of an aluminium free steel but is used in vertical well bores. Therefore, there is a specific need for a heavy weight drill pipe that can reduce fatigue in high angle and/or horizontal well bores that have a corrosive environment.
  • Summary of the Invention
  • Therefore, it is a primary object of the present invention to provide a heavy weight drill pipe member for use in a high angle or horizontal well bore that has a corrosive environment.
  • It is an object of the present invention to provide a heavy weight drill pipe member that is specially treated to attain a unique combination of material properties including a preferred Brinell hardness, yield strength and impact strength for improved resistance to corrosion cracking hydrogen embrittlement, bending stresses and shock loads encountered in deviated well bores having a corrosive environment.
  • It is another object of the present invention to provide a heavy weight drill pipe member with a tubular body wherein at least substantially the entire tubular body has a Brinell hardness of 217 to 241 for improved resistance to stress corrosion cracking and hydrogen embrittlement, a yield strength of 620,528 kPa (90,000 psi) to 723,949 kPa (105,000 psi) for improved resistance to bending stresses, and an impact strength of at least 136 J (100 ft.-lbs) for improved resistance to shock loads.
  • It is yet another object of the present invention to provide a heavy weight drill pipe member with a first and a second tool joint at a first and a second distal end of the tubular body wherein at least substantially the entirety of each first and second tool joint has a Brinell hardness of 248 to 269 for improved resistance to stress corrosion cracking and hydrogen embrittlement, a yield strength of 689,476 kPa (100,000 psi) to 792,897 kPa (115,000 psi) for improved resistance to bending stresses and an impact strength of at least 88 J (65 ft.-lbs) for improved resistance to shock loads.
  • It is still another object of the present invention to provide a method for producing a heavy weight drill pipe member by preheating an elongated tubular member to 885°C - 913°C (1625°F-1675°F), then liquid quenching the preheated tubular member for 10 to 20 minutes, and finally tempering the quenched tubular member for 20 to 40 minutes at 738°C - 766°C (1360°F-1410°F) to achieve a Brinell hardness of 217 to 241, a yield strength of 620,528 kPa (90,000 psi) to 723,949 kPa (105,000 psi) and an impact strength of at least 136 J (100 ft.-lbs) throughout substantially the entire tubular member.
  • It is still another object of the present invention to provide a method for producing a heavy weight drill pipe member having a first and second tool joint connected to a respective first and second distal end of the tubular member by preheating the first and second tool joint to 924°C - 952 °C (1695°F-1745°F), then liquid quenching the first and second tool joint for 10 to 20 minutes, and finally tempering the quenched first and second tool joint for 30 to 45 minutes at 688°C - 723°C (1270°F-1333°F) to achieve a Brinell hardness of 248 to 269, a yield strength of 689,476 kPa (100,000 psi) to 792,897 kPa (115,000 psi) and an impact strength of at least 88 J (65 ft.-lbs) throughout substantially the entirety of each first and second tool joint which may then be attached to a respective first and second distal end of the tubular member. It is an advantage of the present invention to provide the heavy weight drill pipe member with a first and second tool joint attached to a respective first and second distal end of the tubular member wherein the first tool joint comprises a pin member having external threads and the second tool joint comprises a box member having internal threads for threadably connecting a respective heavy weight drill pipe member.
  • It is another advantage of the present invention to provide the heavy weight drill pipe member with a first and second tool joint attached to a respective first and second distal end of the tubular member wherein at least one of the first and second tool joints comprises an internally threaded box having an axially extending internal diameter bore that is constant substantially along a longitudinal axis from the internal threads to adjacent at least one of the first and second distal ends of the tubular member for reducing fatigue and stiffness.
  • If is a feature of the present invention to provide the heavy weight drill pipe member with one or more spaced protectors along the longitudinal axis of the dnil pipe to engage the wall of the well bore and limit the bending stress in the drill pipe by limiting the amount the drill pipe can bend when in compression.
  • It is another feature of the present invention to provide the heavy weight drill pipe member with one or more spaced protectors along the longitudinal axis of the drill pipe wherein each spaced protector includes a spiral groove on its outer circumferential surface to reduce differential pressure and sticking of the heavy weight drill pipe member in the well bore.
  • It is still another, feature of the present invention to provide the heavy weight drill pipe member with one or more spaced protectors along the longitudinal axis of the drill pipe and a first and second tool joint at a respective first and second distal end of the drill pipe wherein one or more of the spaced protectors and the first and second tool joints are hard faced or banded for reducing wear.
  • The present invention is therefore directed to a heavy weight drill pipe member for use in a deviated well bore having a corrosive environment. The heavy weight drill pipe member includes a tubular body having a longitudinal bore therethrough, a first distal end and a second distal end. The tubular body is specially treated such that at least substantially the entire tubular body has a Brinell hardness of 217 to 241 for improved resistance to stress corrosion cracking and hydrogen embrittlement, a yield strength of 620,528 kPa (90,000 psi) to 723,949 kPa (105,000 psi) for improved resistance to bending stresses, and an impact strength of at least 136 J (100 ft.-lbs) as measured by a Charpy-V impact test at ambient temperatures for improved resistance to shock loads. In another embodiment, at least substantially the entire tubular body has a Brinell hardness of 223 to 235, a yield strength of 655,002 kPa (95,000 psi) to 689,476 kPa (100,000 psi) and an impact strength of at least 136 J (100, ft.-lbs). In a preferred embodiment, at least substantially the entire tubular body has a Brinell hardness of 229, a yield strength of 655,002 kPa (95,000 psi) and an impact strength of at least 136 J (100 ft.-lbs).
  • A first tool joint and a second tool joint are connected to a respective first and second distal end of the tubular body wherein at least substantially the entirety of each first and second tool joint are specially treated to achieve a Brinell hardness of 248 to 269 for improved resistance to stress corrosion cracking and hydrogen embrittlement, a yield strength of 689,476 kPa (100,000 psi) to 792,897 kPa (115,000 psi) for improved resistance to bending stresses and an impact strength of at least 88 J (65 ft.-lbs) as measured by Charpy-V impact test at ambient temperatures for improved resistance to shock loads. Each of the first and second tool joints have an open distal end and a longitudinal bore therethrough in communication with the longitudinal bore of the tubular body. In another embodiment, at least substantially the entirety of each first and second tool joint has a Brinell hardness of 254 to 263, a yield strength at 723,949 kPa (105,000 psi) to 758,423 kPa (110,000 psi) and an impact strength of at least 88 J (65 ft.-lbs). In a preferred embodiment, at least substantially the entirety of each first and second tool joint has a Brinell hardness of 258, a yield strength of 723,949 kPa (105,000 psi) and an impact strength of at least 88 J (65 ft.-lbs).
  • The first tool joint preferably includes an externally threaded pin adjacent the open distal end for threadably connecting another heavy weight drill pipe member. The second tool joint preferably includes an internally threaded box adjacent the open distal end for threadably connecting another heavy weight drill pipe member. Thus, multiple heavyweight drill pipe members may be interconnected to form a continuous heavy weight drill pipe string of a desired length having the foregoing described material properties. The internally threaded box includes an axially extending internal bore that is constant substantially along the longituditial axis from the internal threads to adjacent the second distal end of the tubular body for reducing fatigue in the heavy weight drill pipe member.
  • One or more upsets or protectors may be positioned along the longitudinal axis of the tubular body wherein each of the protectors has an outside diameter greater than an outside diameter of the tubular body but no greater than an outside diameter of each first and second tool joint for limiting the bending stresses in the tubular body while the heavyweight drill pipe is being run in the deviated well bore. Each of the one or more upsets or protectors may also include a spiral groove in an outer circumferential surface for reducing differential pressure and sticking of the heavy weight drill pipe as it is run in the deviated well bore. In one embodiment, the first and second tool joint and at least one of the one or more upsets or protectors are hard banded substantially about an outer circumferential surface for reducing wear on the surface of the heavy weight drill pipe as the upsets and fist and second tool joint contact the wall of the deviated well bore.
  • In another embodiment, the heavy weight drill pipe member includes an elongate tubular member having a longitudinal bore therethrough, a first tool joint and a second tool joint positioned at a respective first distal end and second distal end of the tubular member. At least substantially the entire tubular member has a Brinell hardness of about 258 for improved resistance to stress corrosion cracking and hydrogen embrittlement, a yield strength of 620,528 kPa (90,000 psi) to 723,949 kPa (105,000 psi) for improved resistance to bending stresses and an impact strength of at least 136 J (100 ft.-lbs) as measured by a Charpy-V impact test at ambient temperatures for improved resistance to shock loads.
  • The first tool joint includes an externally threaded pin adjacent a distal end for threadably connecting another heavy weight drill pipe member and the second tool joint includes an internally threaded box adjacent a distal end for threadably connecting another drill pipe member. Thus, multiple heavy weight drill pipe members may be interconnected to form a continuous heavy weight drill pipe string of a desired length having the foregoing described material properties. The internally threaded box includes an axially extending internal bore that is constant substantially along the longitudinal axis from the internal threads to adjacent the second distal end of the tubular member for reducing fatigue in the heavy weight drill pipe member.
  • One or more upsets or protectors may be positioned along the longitudinal axis of the tubular member wherein each of the upsets or protectors has an outside diameter greater than an outside diameter of the tubular member but no greater than an outside diameter of the first and second tool joint for limiting the bending stresses in the tubular member. Each of the upsets or protectors may also include a spiral groove in an outer circumferential surface for reducing differential pressure and sticking of the heavy weight drill pipe as it is run in the deviated well bore. The first and second tool joint and at least one of the one or more upsets or protectors are preferably hard banded substantially about an outer circumferential surface for reducing wear on the heavy weight drill pipe as the upsets and first and second joint contact the wall of the deviated well bore.
  • In a preferred method of producing a heavy weight drill pipe member for use in a deviated well bore having a corrosive environment, an elongated tubular member having a longitudinal bore therethrough is first preheated to 885°C to 913°C (1625°F to 1675°F). The preheated tubular member is then liquid quenched for 10 to 20 minutes and then tempered at 738°C to 766°C (1360°F to 1410°F) for 20 to 40 minutes to achieve a Brinell hardness of 217 to 241, a yield strength of 620,528 kPa (90,000 psi) to 723,949 kPa (105,000 psi) and an impact strength of at least 136 J (100 ft.-lbs) throughout substantially the entire tubular member.
  • A first tool joint and a second tool joint each having an open distal end and a longitudinal bore therethrough are preheated to 924°C to 952°C (1695°F to 1745°F). Each first and second tool joint are then liquid quenched for 10 to 20 minutes and then tempered at 688°C to 723°C (1270°F to 1333°F) for 30 to 45 minutes to achieve a Brinell hardness of 248 to 269, a yield strength of 689,476 kPa (100,000 psi) to 792,897 kPa (115,000 psi) and an impact strength of at least 88 J (65 ft.-lbs) throughout substantially the entirety of each first and second tool joint. The first and second tool joints are then attached to a respective first and second distal end of the tubular member such that the longitudinal bore of each first and second tool joint is aligned and in communication with the longitudinal bore of the tubular member.
  • An outside diameter of the first tool joint adjacent an open distal end is then machined to form an externally threaded pin for connecting another heavy weight drill pipe member. The inside diameter of the second tool joint adjacent an open distal end is then machined to form an internally threaded box for connecting another heavy weight drill pipe member. The heavy weight drill pipe member may thus be interconnected with multiple other specially treated heavy weight drill pipe members to form a continuous heavy weight drill pipe string of a desired length for use in a deviated well bore having a corrosive environment.
  • These and other objects, advantages and features of this invention will be apparent to those skilled in the art from a consideration of the detailed description of the various embodiments wherein reference is made to the attached drawings and appended claims.
  • Brief Description of the Drawings
    • Figure 1 is an elevation view of the heavy weight drill pipe of the present invention.
    • Figure 2 is a cross-section of the heavy-weight drill pipe in Figure 1 along line 2-2.
    • Figure 3 is a partial cross-sectional view of the heavy weight drill pipe in Figure 1 along line 3-3.
    Detailed Description of Preferred Embodiments
  • With reference now to Figures 1 and 2, the heavy weight drill pipe member of the present invention includes an elongated tubular member 10 having a longitudinal bore 29 therethrough. A first and second tool joint 20 and 22 are positioned at a respective first distal end 19, and second distal end 21 of to the tubular member 10. Each first and second tool joint 20 and 22 include a respective tubular bore 27 and 31 that communicates with the longitudinal bore 29 of the tubular member 10. The first tool joint 20 includes an externally threaded pin 23 and the second tool joint 22 includes an internally threaded box 25 (Figure 3) for connecting another heavy weight drill pipe member to a respective first and second tool joint 20 and 22.
  • The first and second tool joints 20 and 22 are preferably machined separately from the tubular member 10, and then permanently attached to a respective first and second distal end 19 and 21 of the tubular member 10. The tubular member 10 and upsets 12, 14 and 16 are machined from a AISI (American Iron and Steel Institute) 4130-modified pierced, thick wall alloy steel wall tubing stock which is commercially available from the Timken Company.
  • The first and second tool joints 20 and 22 are machined from AISI 4145-modified also commercially available from the Timken Company. Alternatively, the tubular member 10 and first and second tool joints 20 and 22 may be machined from a single AISI 4130-modified tubular piece of stock.
  • In a preferred embodiment; a plurality of upsets 12, 14 and 16 are axially positioned along the tube section 18 for reducing bending stresses in the tubular member 10, wherein each of the plurality of upsets 12; 14 and 16 have an outside diameter greater than the outside diameter of the tubular member 10, but no greater than the outside diameter of each first and second tool joint 20 and 22. Depending on the length of the tubular member 10 and the relative deviated angle of the well bore, a single upset or protector 12, 14 or 16 may be adequate.
  • With reference now to Figure 3, fatigue caused by bending stresses in the tubular member 10 may be reduced by axially extending the internal diameter of the tubular bore 31 adjacent the internally threaded box 25 from a first terminable point 33 to a second terminable point 35, such that the tubular bore 31 is constant substantially along the longitudinal axis from the internally threaded box 25 to adjacent the second distal end 21 of the tubular member 10. Although the internal diameter between 33 and 35 is slightly less than the internal diameter between the internally threaded box 25 and 33, this additional material 37 between 33 and 35 is needed for machining additional threads as the internally threaded box 25 becomes worn or cracked and must be remachined.
  • Stress in the tubular member 10 and corresponding stiffness in the internally threaded box 25 may thus be reduced by as much as 6½ percent when compared to the standard dimensions of an internally threaded box for a standard heavyweight drill pipe tubular member. For example, by comparing the section modulis (z) for standard 4 1/2" heavy weight drill pipe to that of the present invention, a percentage reduction factor of stiffness in the box tool joint can be determined. If : z = I / C = 0.098 ( D 4 d 4 D )

    Then for standard 11.4 cm (4 1/2 inch) heavy weight drill pipe: z = .098 ( 6.25 4 2.875 4 6.25 ) = 22.85

    and for modified heavy weight drill pipe including a bore back: z = .098 ( 6.25 4 3.578 4 6.25 ) = 21.35

    The corresponding difference is 22.85 - 21.35 = 1.5 or 1.5/22.85 = 6.56% decrease in stiffness which will reduce stresses in the tube and in turn improve fatigue life.
  • Referring again to Figures 1 and 2, upsets 12, 14 and 16 may include a spiral groove 24 in an outer circumferential surface for reducing differential pressure and sticking of the heavy weight drill pipe in the well bore. As shown in Figure 2, each upset includes a spiral groove 24 spirally 120° apart. The groove 24 is relatively shallow and substantially flat so that less than 4% of the middle of each upset is removed resulting in a negligible effect on the weight of the heavy weight drill pipe. For example, dimension "D"in Figure 2 is about 0.56 cm (7/32 inch) for every 12.7 cm (5 inches) of outside diameter of the tubular member 10.
  • Hard banding may also be applied to the first and second tool joints 20 and 22, and upsets 12, 14 and 16 in order to reduce wear. In Figure 1, each first and second tool joint 20 and 22 has a respective hard banded surface 26 and 28. Additionally, the middle or center upset 14 includes hard banded surfaces 30 and 32.
  • Although the structural features thus described for the heavy weight drill pipe are intended to reduce wear, fatigue and differential pressure and sticking encountered by the heavy weight drill pipe in a well bore, the material characteristics or properties of the tubular member 10 and first and second tool joints 20 and 22 are crucial to the durability and longevity of the heavy weight drill pipe in deviated or high angle well bores having a corrosive environment. The crucial material characteristics or properties typically include material hardness, yield strength and impact strength. The material hardness is preferably measured according to Brinell hardness (BHN) which is based on an outside surface test in the tubular member 10 however, may also be measured according to a Rockwell C hardness (HRC) based on laboratory test readings which represents hardness substantially throughout the entire tubular wall. The yield strength is typically measured by PSI and the impact strength is preferably measured in foot-pounds by a Charpy-V impact test conducted at ambient temperatures in the range of 21 °C - 23°C (70° -74°F.)
  • Accordingly, tubular member 10 is treated to achieve at least substantially throughout the entire tubular member 10, a BHN of 217 to 241 for improved resistance to stress corrosion cracking and hydrogen embrittlement, a yield strength of 620,528 kPa (90,000 psi) to 723,949 kPa (105,000 psi) for improved resistance to bending stresses, and an impact strength of at least 136 J (100 ft.-lbs) at ambient temperatures for improved resistance to shock loads.
  • In another embodiment, the tubular member 10 is treated to achieve at least substantially throughout the entire tubular body 10, a BHN of 223 to 235 for improved resistance to stress corrosion cracking and hydrogen embrittlement, a yield strength of 655,002 kPa (95,000 psi) to 689,476 kPa (100,000 psi) for improved resistance to bending stresses, and an impact strength of at least 136 J (100 ft.-lbs) at ambient temperatures for improved resistance to shock loads.
  • In a preferred embodiment, the tubular member 10 is treated to achieve at least substantially throughout the entire tubular member 10, a BHN of 229 for improved resistance to stress corrosion cracking and hydrogen embrittlement, a yield strength of about 655,002 kPa (95,000 psi) for improved resistance to bending stresses, and an impact strength of at least 136 J (100 ft.-lbs) at ambient temperatures for improved resistance to shock loads.
  • The first and second tool joint 20 and 22 are separately machined from AISI 4145-modified and are specially treated such that at least substantially the entirety of each first and second tool joint 20 and 22 have a BHN of 248 to 269 for improved resistance to stress corrosion cracking and hydrogen embrittlement, a yield strength of 689,476 kPa (100,000 psi) to 792,897 kPa (115,000 psi) for improved resistance to bending stresses, and an impact strength of at least 88 J (65 ft.-lbs) as measured by Charpy-V impact test at ambient temperatures for improved resistance to shock loads.
  • In another embodiment, each first and second tool joint 20 and 22 is specially treated to achieve at least substantially throughout the entirety of each first and second tool joint 20 and 22, a BHN of 254 to 263 for improved resistance to stress corrosion cracking and hydrogen embrittlement, a yield strength of 723,949 kPa (105,000 psi) to 758,423 kPa (110,000 psi) for improved resistance to bending stresses, and an impact strength of at least 88 J (65 ft.-lbs) as measured by a Charpy-V impact test at ambient temperatures for improved resistance to shock loads.
  • In a preferred embodiment, each first and second tool joint 20 and 22 is specially treated to achieve at least substantially throughout the entirety of each first and second tool joint 20 and 22, a BHN of 258 for improved resistance to stress corrosion cracking and hydrogen embrittlement, a yield strength of 723,949 kPa (105,000 psi) for improved resistance to bending stresses, and an impact strength of at least 88 J (65 ft.-lbs) as measured by Charpy-V impact test at ambient temperatures for improved resistance to shock loads.
  • If the tubular member 10 and first and second tool joints 20 and 22 are made from the same AISI 4130-modified tubular stock, then the heavy weight drill pipe member is treated to achieve at least substantially throughout the entirety of the tubular body 10 and first and second tool joints 20 and 22, a BHN of 217 to 241 for improved resistance to stress corrosion cracking and hydrogen embrittlemeiit, a yield strength of 620,528 kPa (90,000 psi) to 723,949 kPa (105,000 psi) and an impact strength of at least 136 J (100 ft.-lbs) as measured by a Charpy-V impact test at ambient temperatures for improved resistance to shock loads. The preferred material properties for the tubular member 10 and first and second tool joint 20 and 22 made from the same AISI 4130-modified tubular stock are substantially equivalent to the preferred material properties described above in reference to the first and second tool joints made from AISI 4145-modified tubular stock.
  • The preferred material properties (hardness, yield strength and impact strength) thus represent the toughness and strength of a material and are directly related to the treatment or processing of the material comprising the tubular member 10 and first and second tool joints 20 aiid22. These material characteristics or properties are related to the cooling rate of the material after it has been preheated. Thus, a correlation exists between the impact energy of a material and its yield strength such that the higher the impact strength, the lower the yield strength and vice versa. Additionally, the harder the material, the higher the yield strength. The treatment of the tubular member 10 and first and second tool joints 20 and 22 yields unique material properties that permit the heavy weight drill pipe member to be used in a deviated well bore that has a corrosive environment. In order to attain these unique material characteristics or properties, a particular process of preheating, quenching and tempering the material comprising the tubular member 10 and first and second tool joints 20 and 22 is employed.
  • For instance, in order to achieve the material properties and characteristics for a tubular member 10 made of AISI 4130-modified tubular stock as generally described above, the tubular member 10 must first be preheated to 885 °C to 913°C (1625°F to 1675°F) where it is transformed to a phase commonly referred to as austenite. As the microstructure of the tubular member 10 becomes homogeneous and the tubular member 10 is in a solid solution state, the austenite begins to absorb alloy elements and is soon ready to be liquid quenched using water or any other suitable fluid, depending upon the required cooling rate.
  • Liquid quenching the tubular member 10 is a critical stage for achieving the unique combination of material properties described above because the fineness of the microstructure of the tubular member 10 is dependent upon the rate at which heat is removed. If heat is removed too slowly, the microstructure will be composed of undesirable pearlite and/or bainite. If the tubular member 10 is cooled too rapidly, the tubular member 10 may crack or even explode. Therefore, the quenching process must be fast enough to transform the microstructure to a phase commonly referred to as martensite without cracking the tubular member 10. This critical cooling rate must not only be achieved on the surface of the tubular member 10, but consistently throughout the material as well. Therefore, the tubular member 10 must have an adequate depth of hardening, which is the depth to which the rate of cooling is fast enough to transform the austenite to martensite.
  • Tempering is another critical stage needed for achieving the unique combination of material properties described above. After quenching the material, the tubular member 10 will preferably posses a very fine microstructure of at least 90% martensite, but will also have very high hardness and residual stress values due to the fast cooling rate. The tempering process is used to attain a phase commonly referred to as tempered martensite. The tempering process refines the material properties to achieve a preferred combination of yield strength, tensile strength, hardness, and impact strength. The tempering process is typically dependent upon the temperature and the soaking time in the tempering furnace. The temperature and soaking time thus control the microstructure and yield strength, tensile strength, hardness, impact strength, and corrosion resistance.
  • Accordingly, the tubular member 10 is liquid quenched for a period of 10 to 20 minutes in order to achieve a minimum of 90 percent martensite in the microstructure is and then tempered at 738°C to 766°C (1360°F to 1410°F) for 20 to 40 minutes. The tempered martenistic microstructure yields a very strong, tough ductile and resilient material suitable for both high stress applications encountered in deviated well bores and corrosive environments. Although tempering causes the tubular member 10 to lose some of its hardness, it gains toughness and resiliency resulting in the material having a close knit, small grain, martenistic microstructure having the general material characteristics or properties described above. The combined material hardness, yield strength and impact strength generally described above are sufficient to meet industry (NACE) standards by achieving a minimum 85% specified maximum yield strength according to NACE standard procedures. These specified material properties will substantially improve the performance and durability of the heavy weight drill pipe member during high stress applications in a deviated well bore that has a corrosive environment.
  • In a preferred method of producing the tubular member 10, the tubular member 10 is first preheated fo about 899°C (1650°F). The tubular member 10 is then liquid quenched for at least 10 minutes and then tempered to about 752°C (1385°F) for at least 20 minutes to achieve a preferred BHN of about 229, a yield strength of about 655,002 kPa (95,000 psi) and on impact strength of at least 136 J (100, ft.-lbs) at ambient temperatures throughout substantially the entire tubular member 10.
  • In order to achieve material properties for the first and second tool joints 20 and 22 made of AISI 4145-modified tubular stock as generally described above, the first and second tool joint 20 and 22 are treated in similar fashion to that described above in reference to the tubular member 10. For example, each first and second tool joint 20 and 22 is first preheated to 924°C to 952°C (1695°F to 1745°F) to achieve an austenite phase or structure. The first and second tool joint 20 and 22 are then liquid quenched using water or any other suitable fluid for a period of 10 to 20 minutes, and then tempered to 688°C to 721°C (1270°F to 1330°F) for 30 to 45 minutes.
  • In a preferred method of producing the first and second tool joint 20 and 22, the first and second tool joint 20 and 22 are first preheated to 938°C (1720°F). The first and second tool joint 20 and 22 are then liquid quenched for a period of at least 10 minutes and then tempered to about 704 °C (1300°F) for at least 30 minutes to achieve a preferred BHN of about 258, a yield strength of about 723,949 kPa (105,000 psi) and an impact strength of at least 88 J (65 ft.-lbs) at ambient temperatures throughout substantially the entirety of each first and second tool joint 20 and 22.
  • If, however, the tubular member 10 and first and second tool joint 20 and 22 are machined from the same AISI 4130-modified tubular stock, then the heavy weight drill pipe member is preheated to 885°C to 913°C (1625°F to 1675°F) and then liquid quenched for 10 to 20 minutes. The heavy weight drill pipe member is then tempered to 654°C to 752°C (1210°F to 1385°F) for 20 to 45 minutes. In a preferred method, of producing the tubular member 10 and first and second tool joint 20 and 22 made of the same AISI 4130-modified tubular stock, the heavy weight drill pipe member is preheated to about 899°C (1650°F) and then liquid quenched for at least 10 minutes. The heavy weight drill pipe member is then tempered to 704°C (1300°F) for at least 20 minutes to achieve a preferred BHN of about 258, a yield strength of about 723,949 kPa (105,000 psi) and an impact strength of at least 88 J (65 ft.-lbs) at ambient temperatures throughout substantially the entire tubular member 10 and first and second tool join 20 and 22.
  • The process or treatment of preheating, liquid quenching and tempering can be achieved with either a conventional batch type heat treating system or a continuous line heat treating process (CLH). Although the preferred material properties generally described above for the tubular member 10 and first and second tool joints 20 and 22 may be obtained by either method, there is a greater assurance of uniform properties throughout the entire material using the CLH system which involves feeding the tubular member 10 and first and second tool joint 20 and 22 at a continuous rate through a furnace while rotating the same to achieve uniform treatment of the material. Once the tubular member 10 and first and second tool joint 20 and 22 are treated as described above to attain the optimum material properties needed for use in a deviated well bore having a corrosive environment, the first and second tool joint 20 and 22 may be permanently attached to a respective, first and second distal end 19 and 21 of the tubular member 10 and machined to form an externally threaded pin 23 on the first tool joint 20, and an internally threaded box 25 on the second tool joint 22 for connecting a respective heavy weight drill pipe member to the first and second tool joint 20 and 22.
  • From the foregoing it will be seen that this invention is one well adapted to accomplish all the ends and objects herein above set forth together with other advantages and features which are obvious and inherent to the apparatus and structure. It will be understood that certain features and subcombinations are of utility and may be employed without reference to other features and subcombinations. This is contemplated by and is within the scope of the claims. Because many possible embodiments may be made of the invention without departing from the scope thereof, it is to be understood that all matter herein set forth or shown in the accompanying drawings is to be interpreted as illustrative in a limiting sense.

Claims (16)

  1. A heavy weight drill pipe member suitable for use in a deviated well bore having a corrosive environment comprising:
    a tubular body (10) having a longitudinal bore (29) therethrough and a first (19) and second (21) distal end, at least substantially the entire tubular body having a Brinell hardness of 217 to 241 for improved resistance to stress corrosion cracking and hydrogen embrittlement, a yield strength of 620,528 kPa to 723,949 kPa (90,000 psi to 105,000 psi) for improved resistance to bending stresses, and an impact strength of at least 136 J (100 ft.-lbs) as measured by a Charpy-V impact test at ambient temperatures for improved resistance to shock loads,
    wherein the heavy weight drill pipe member is producable by:
    - preheating the tubular body (10) having a longitudinal bore (29) therethrough, and first (19) and second (21) distal ends to 885°C to 913°C (1625°F to 1675°F);
    - liquid quenching the tubular body (10) for 10 to 20 minutes; and
    - tempering said quenched tubular body for 20 to 40 minutes at 738°C to 766°C (1360°F to 1410°F) to achieve a Brinell hardness of 217 to 241, a yield strength of 620,528 kPa to 723,949 kPa (90,000 psi to 105,000 psi) and an impact strength of at least 136 J (100 ft.-lbs) throughout substantially the entire tubular member.
  2. The heavy weight drill pipe member of Claim 1, wherein at least substantially the entire tubular body has a Brinell hardness of 223 to 235, a yield strength of 655,002 kPa to 689,476 kPa (95,000 psi to 100,000 psi), and an impact strength of at least 136 J (100 ft.-lbs).
  3. The heavy weight drill pipe member of Claim 1, wherein at least substantially the entire tubular body has a Brinell hardness of about 229, a yield strength of about 655,001 kPa (95,000 psi) and an impact strength of at least 136 J (100 ft.-lbs).
  4. The heavy weight drill pipe member of Claim 1, further comprising:
    a first tool joint (20) and a second tool joint (22), said first and second tool joint connected to a respective first (19) and second (21) distal end of the tubular body (10);
    each of said first and second tool joints having an open distal end and a longitudinal bore (27, 31) therethrough in communication with the longitudinal bore of the tubular body;
    at least substantially the entirety of each first and second tool joint having a Brinell hardness of 248 to 269 for improved resistance to stress corrosion cracking and hydrogen embrittlement, a yield strength of 689,476 kPa to 792,897 kPa (100,000 psi to 115,000 psi) for improved resistance to bending stresses and an impact strength of at least 88 J (65 ft.-lbs) as measured by a Charpy-V impact test at ambient temperatures for improved resistance to shock loads.
  5. The heavy weight drill pipe member of Claim 4, wherein at least substantially the entirety of each first and second tool joint has a Brinell hardness of 254 to 263, a yield strength of 723,949 kPa to 758,423 kPa (105,000 psi to 110,000 psi), and an impact strength of at least 88 J (65 ft.-lbs).
  6. The heavy weight drill pipe member of Claim 4, wherein at least substantially the entirety of each first and second tool joint has a Brinell hardness of about 258, a yield strength of about 723,949 kPa (105,000 psi) and an impact strength of at least 88 J (65 ft.-lbs).
  7. The heavy weight drill pipe member of Claim 4, wherein said first tool joint has an externally threaded pin (23) adjacent the open distal end for threadably connecting another heavy weight drill pipe member.
  8. The heavy weight drill pipe member of Claim 4, wherein said second tool joint has an internally threaded box (25) adjacent the open distal end for threadably connecting another heavy weight drill pipe member,
  9. The heavy weight drill pipe member of Claim 8, wherein said internally threaded box (25) includes an axially extending internal bore (31) that is constant substantially along the longitudinal axis from the internal threads to adjacent the second distal end of the tubular body for reducing fatigue.
  10. The heavy weight drill pipe member of Claim 1, further comprising: one or more protectors (12, 14, 16) positioned along the longitudinal axis of the tubular body, each of said protectors having an outside diameter greater than an outside diameter of the tubular body but no greater than an outside diameter of each first and second tool joint for limiting the bending stresses in the tubular body.
  11. The heavy weight drill pipe member of Claim 10, wherein each of said protectors includes a spiral groove (24) in an outer circumferential surface for reducing differential pres-sure and sticking of the heavy weight drill pipe in the well bore.
  12. The heavy weight drill pipe member of Claim 11, wherein said first and second tool joint and at least one of said protectors are hard banded substantially about an outer circumferential surface (26, 28) for reducing wear.
  13. A method of producing a heavy weight drill pipe member suitable for use in a deviated well bore having a corrosive environment, comprising:
    - preheating an elongated tubular member (10) having a longitudinal bore (29) therethrough, and first (19) and second (21) distal ends to 885°C to 913°C (1625°F to 1675°F);
    - liquid quenching said preheated tubular member for 10 to 20 minutes; and
    - tempering said quenched tubular member for 20 to 40 minutes at 738°C to 766°C (1360°F to 1410°F) to achieve a Brinell hardness of 217 to 241, a yield strength of 620,528 kPa to 723,949 kPa (90,000 psi to 105,000 psi) and an impact strength of at least 136 J (100 ft.-lbs) throughout substantially the entire tubular member.
  14. The method of producing a heavy weight drill pipe member of Claim 13, further comprising:
    - preheating a first tool joint (20) and a second tool joint (22) to 924°C to 952°C (1695°F to 1745°F), each first and second tool joint having an open distal end and a' longitudinal bore (27,31) therethrough;
    - liquid quenching said first and second tool joint for 10 to 20 minutes;
    - tempering said quenched first and second tool joint for 30 to 45 minutes at 688°C to 721°C (1270°F to 1330°F) to achieve a Brinell hardness of 248 to 269, a yield strength of 689,476 to 792,897 kPa (100,000 psi to 115,000 psi) and an impact strength of at least 88 J (65 ft.-lbs) throughout substantially the entirety of each first and second tool joint;
    - attaching said first and second tool joints to a respective first and second distal end of the tubular member.
  15. The method of producing the heavy weight drill pipe member of Claim 14, further comprising: machining threads (23) on an outside diameter of said first tool joint adjacent an open distal end for connecting another heavy weight drill pipe member.
  16. The method of producing the heavy weight drill pipe member of Claim 14, further comprising: machining threads (25) on an inside diameter of said second tool joint adjacent an open distal end for connecting another heavy weight drill pipe member.
EP99920274A 1998-05-01 1999-04-30 Heavy weight drill pipe Expired - Lifetime EP1078190B1 (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
US09/071,253 US6012744A (en) 1998-05-01 1998-05-01 Heavy weight drill pipe
US71253 1998-05-01
PCT/US1999/009621 WO1999057478A1 (en) 1998-05-01 1999-04-30 Heavy weight drill pipe

Publications (3)

Publication Number Publication Date
EP1078190A1 EP1078190A1 (en) 2001-02-28
EP1078190A4 EP1078190A4 (en) 2003-04-09
EP1078190B1 true EP1078190B1 (en) 2006-07-12

Family

ID=22100205

Family Applications (1)

Application Number Title Priority Date Filing Date
EP99920274A Expired - Lifetime EP1078190B1 (en) 1998-05-01 1999-04-30 Heavy weight drill pipe

Country Status (9)

Country Link
US (1) US6012744A (en)
EP (1) EP1078190B1 (en)
JP (1) JP2002513904A (en)
CN (1) CN1126894C (en)
AR (1) AR015061A1 (en)
AU (1) AU3781299A (en)
CA (1) CA2330963C (en)
DE (1) DE69932333T2 (en)
WO (1) WO1999057478A1 (en)

Families Citing this family (33)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB0024909D0 (en) * 2000-10-11 2000-11-22 Springer Johann Drill string member
KR20040002377A (en) * 2001-04-26 2004-01-07 후루카와 기카이 긴조쿠 가부시키가이샤 Step tube rod and boring machine
WO2002097232A1 (en) * 2001-06-01 2002-12-05 Sandvik Tamrock Oy Method and arrangement for rock drilling and tool and rock drill used in rock drilling
WO2004094768A2 (en) * 2003-04-23 2004-11-04 Th Hill Associates, Inc. Drill string design methodology for mitigating fatigue failure
US7845434B2 (en) * 2005-03-16 2010-12-07 Troy Lee Clayton Technique for drilling straight bore holes in the earth
US7472764B2 (en) * 2005-03-25 2009-01-06 Baker Hughes Incorporated Rotary drill bit shank, rotary drill bits so equipped, and methods of manufacture
US7377137B1 (en) * 2005-10-27 2008-05-27 Bednarz James W Barrel lock with infinite axial adjustment
US7377315B2 (en) * 2005-11-29 2008-05-27 Hall David R Complaint covering of a downhole component
US7497254B2 (en) * 2007-03-21 2009-03-03 Hall David R Pocket for a downhole tool string component
US20100018699A1 (en) * 2007-03-21 2010-01-28 Hall David R Low Stress Threadform with a Non-conic Section Curve
US8201645B2 (en) * 2007-03-21 2012-06-19 Schlumberger Technology Corporation Downhole tool string component that is protected from drilling stresses
US7669671B2 (en) 2007-03-21 2010-03-02 Hall David R Segmented sleeve on a downhole tool string component
US20080302574A1 (en) * 2007-06-08 2008-12-11 Tt Technologies, Inc. Drill stem and method
US20090025982A1 (en) * 2007-07-26 2009-01-29 Hall David R Stabilizer Assembly
US7963323B2 (en) * 2007-12-06 2011-06-21 Schlumberger Technology Corporation Technique and apparatus to deploy a cement plug in a well
US7814996B2 (en) * 2008-02-01 2010-10-19 Aquatic Company Spiral ribbed aluminum drillpipe
US8002331B2 (en) 2008-09-11 2011-08-23 Honda Motor Company, Ltd. Vehicles having utility dump bed and folding seat assembly
US8678447B2 (en) 2009-06-04 2014-03-25 National Oilwell Varco, L.P. Drill pipe system
US8091627B2 (en) 2009-11-23 2012-01-10 Hall David R Stress relief in a pocket of a downhole tool string component
RU2558555C2 (en) 2011-03-14 2015-08-10 РОТАРИ ДРИЛЛИНГ ТУЛЗ ЮЭсЭй ЭлПи Integral wear-resistant pad and method
US8955621B1 (en) 2011-08-09 2015-02-17 Turboflex, Inc. Grooved drill string components and drilling methods
US9091124B2 (en) 2011-10-21 2015-07-28 Weatherford Technology Holdings, Llc Wear and buckling resistant drill pipe
US9085942B2 (en) * 2011-10-21 2015-07-21 Weatherford Technology Holdings, Llc Repaired wear and buckle resistant drill pipe and related methods
US9816328B2 (en) * 2012-10-16 2017-11-14 Smith International, Inc. Friction welded heavy weight drill pipes
US9297410B2 (en) 2012-12-31 2016-03-29 Smith International, Inc. Bearing assembly for a drilling tool
CA2865630A1 (en) 2013-10-01 2015-04-01 Hendrickson Usa, L.L.C. Leaf spring and method of manufacture thereof having sections with different levels of through hardness
CA2928535C (en) * 2013-10-25 2020-11-24 National Oilwell Varco, L.P. Downhole hole cleaning joints and method of using same
CN103711440A (en) * 2013-12-19 2014-04-09 江苏曙光华阳钻具有限公司 Spiral type heavy weight drill pipe
EP3256691A1 (en) 2015-02-13 2017-12-20 National Oilwell Varco, L.P. A detection system for a wellsite and method of using same
US10648049B2 (en) * 2015-04-14 2020-05-12 Wellbore Integrity Solutions Llc Heat treated heavy weight drill pipe
US9493993B1 (en) 2015-06-10 2016-11-15 Ptech Drilling Tubulars Llc Work string and method of completing long lateral well bores
CN105041230A (en) * 2015-09-07 2015-11-11 山西风雷钻具有限公司 Non-magnetic pressure bearing drill stem with wear-resistant belts
US20190284883A1 (en) * 2018-03-16 2019-09-19 WWW North America Holdings, Inc. Non-rotating vibration reduction sub

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4226645A (en) * 1979-01-08 1980-10-07 Republic Steel Corp. Steel well casing and method of production
US4354882A (en) * 1981-05-08 1982-10-19 Lone Star Steel Company High performance tubulars for critical oil country applications and process for their preparation

Family Cites Families (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AT308793B (en) * 1968-12-02 1973-07-25 Schoeller Bleckmann Stahlwerke Austenitic chrome-nickel-nitrogen-steel alloy for non-magnetizable drill collar and rod parts
US3784238A (en) * 1971-05-17 1974-01-08 Smith International Intermediate drill stem
US3773359A (en) * 1971-06-24 1973-11-20 Smith International Intermediate drill stem
US4273159A (en) * 1978-03-16 1981-06-16 Smith International, Inc. Earth boring apparatus with multiple welds
US4416476A (en) * 1980-09-17 1983-11-22 Oncor Corporation Intermediate weight drill stem member
US4460202A (en) * 1980-11-26 1984-07-17 Chance Glenn G Intermediate weight drill string member
US4400349A (en) * 1981-06-24 1983-08-23 Sumitomo Metal Industries, Ltd. Alloy for making high strength deep well casing and tubing having improved resistance to stress-corrosion cracking
JPH0218381B2 (en) * 1984-11-30 1990-04-25 Nippon Steel Corp
DE3445371C2 (en) * 1984-12-10 1987-12-10 Mannesmann Ag, 4000 Duesseldorf, De
IL82587D0 (en) * 1986-05-27 1987-11-30 Carpenter Technology Corp Nickel-base alloy and method for preparation thereof
US4811800A (en) * 1987-10-22 1989-03-14 Homco International Inc. Flexible drill string member especially for use in directional drilling
AT392802B (en) * 1988-08-04 1991-06-25 Schoeller Bleckmann Stahlwerke METHOD FOR THE PRODUCTION OF TUBE-SHAPED CORROSION-RESISTANT BODY-BODIES, IN PARTICULAR NON-MAGNETIZABLE HEAVY RODS FROM AUSTENITIC STEELS

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4226645A (en) * 1979-01-08 1980-10-07 Republic Steel Corp. Steel well casing and method of production
US4354882A (en) * 1981-05-08 1982-10-19 Lone Star Steel Company High performance tubulars for critical oil country applications and process for their preparation

Also Published As

Publication number Publication date
DE69932333T2 (en) 2007-07-19
EP1078190A1 (en) 2001-02-28
CA2330963A1 (en) 1999-11-11
AR015061A1 (en) 2001-04-11
CN1308715A (en) 2001-08-15
AU3781299A (en) 1999-11-23
US6012744A (en) 2000-01-11
DE69932333D1 (en) 2006-08-24
CA2330963C (en) 2008-06-17
EP1078190A4 (en) 2003-04-09
JP2002513904A (en) 2002-05-14
WO1999057478A1 (en) 1999-11-11
CN1126894C (en) 2003-11-05

Similar Documents

Publication Publication Date Title
EP1078190B1 (en) Heavy weight drill pipe
US4710245A (en) Method of making tubular units for the oil and gas industry
EP2028403B1 (en) Threaded joint with high radial loads and differentially treated surfaces
CA2395825C (en) Elongated element and steel for percussive rock drilling
CA2682959A1 (en) A seamless steel tube for the application as work-over riser
US20060289074A1 (en) Pipe with a canal in the pipe wall
CN101581200A (en) 120 steel grade drill pipe and manufacturing process method thereof
JP2008534822A (en) Radial expansion system
CA2254760A1 (en) Friction welded drill rod and method for manufacturing the rod
Cirimello et al. Failure and integrity analysis of casings used for oil well drilling
US20070068607A1 (en) Method for heat treating thick-walled forgings
US5334268A (en) Method of producing high strength sucker rod coupling
US10648049B2 (en) Heat treated heavy weight drill pipe
WO2003062484A1 (en) Element for percussive rock drilling and method for its production
US5988301A (en) Drill rod and method for its manufacture
CA2257488A1 (en) Friction welded drill rod and method for manufacturing the rod
Chitwood et al. High-Strength Coiled Tubing Expands Service Capabilities
Garrison et al. Production and fit for service attributes of C125 high strength casing
US20210025248A1 (en) Centralizer
Smith et al. Development of titanium drill pipe for short radius drilling
Urband et al. The effects of OCTG connection swaging and stress relieving on SSC resistance
Schock et al. One-Piece, Forged, Heavy Wall Drillpipe: Built Stronger for Tougher Drilling
Elliott et al. High-strength, thin-wall, all-steel drill pipe may provide solution for ultra-extended-reach wells
Kessler et al. Fatigue resistant disposable drill pipe for short radius applications
Bybee Drillstring Technology for World-Class Extended-Reach Drilling

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 20001114

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): DE FR GB IT

RIC1 Information provided on ipc code assigned before grant

Ipc: 7C 21D 9/00 B

Ipc: 7C 22C 38/00 B

Ipc: 7E 21B 17/16 B

Ipc: 7F 16L 25/00 A

A4 Supplementary search report drawn up and despatched

Effective date: 20030221

17Q First examination report despatched

Effective date: 20040702

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): DE FR GB IT

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT;WARNING: LAPSES OF ITALIAN PATENTS WITH EFFECTIVE DATE BEFORE 2007 MAY HAVE OCCURRED AT ANY TIME BEFORE 2007. THE CORRECT EFFECTIVE DATE MAY BE DIFFERENT FROM THE ONE RECORDED.

Effective date: 20060712

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REF Corresponds to:

Ref document number: 69932333

Country of ref document: DE

Date of ref document: 20060824

Kind code of ref document: P

ET Fr: translation filed
STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed

Effective date: 20070413

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 18

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 19

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 20

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 20180329

Year of fee payment: 20

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FR

Payment date: 20180315

Year of fee payment: 20

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20180417

Year of fee payment: 20

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: IT

Payment date: 20180420

Year of fee payment: 20

REG Reference to a national code

Ref country code: DE

Ref legal event code: R071

Ref document number: 69932333

Country of ref document: DE

REG Reference to a national code

Ref country code: GB

Ref legal event code: PE20

Expiry date: 20190429

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Free format text: LAPSE BECAUSE OF EXPIRATION OF PROTECTION

Effective date: 20190429

heavy weight drill pipe